Category: Case Study
-

How Johnstech Reduced Lead Times by 50%
The semiconductor industry is competitive, with efficiency and reliability being paramount for success. Johnstech International has consistently delivered results that surpass industry standards, most notably achieving a remarkable reduction in lead times to just 3-4 weeks, compared to the typical industry standard of 5-8 weeks. This achievement underscores their use of advanced planning, scheduling, and
-

Customer Case Study: Orbital ATK Proves the Merits of SyncKanban®
This case study reviews the strategy and results of a new Lean project at the Aerospace Structures Division (ASD) of Orbital ATK. The goal of the project was to impact two key inventory metrics – improve inventory turns and reduce inventory cost; specifically, waste associated with material scrap. Download the case study to learn why
-

Customer Case Study: Pyrotek
Customer Case Study: Pyrotek After acquiring more complex equipment and expanding its product line, Pyrotek – a global engineering leader and innovator of performance-improving technical solutions and services for the aluminum industry – experienced tremendous growth. Growth that was compounded by the fact that as an engineer-to-order (ETO) manufacturer of capital equipment, every project they build
-

Case Study: Pyrotek
After acquiring more complex equipment and expanding its product line, Pyrotek – a global engineering leader and innovator of performance-improving technical solutions and services for the aluminum industry – experienced tremendous growth. Growth that was compounded by the fact that as an engineer-to-order (ETO) manufacturer of capital equipment, every project they build is unique. Read the
-

Customer Case Study: GIW® Minerals
Customer Case Study: GIW® Minerals GIW Industries, a KSB Company, is a leader in the design, manufacture and application of heavy-duty centrifugal slurry pumps. After implementing SyncManufacturing® demand-driven planning, scheduling and execution software, GIW was able to increase performance such that they have added capacity to pursue new markets. As a result, they doubled their
-
Video Case Study: How Orbital ATK is Leveraging the IIoT and Visual Factory Technology to Drive Continuous Improvements.
Video Case Study: How Orbital ATK is Leveraging the IIoT and Visual Factory Technology to Drive Continuous Improvements.
